Blog

QGIS 3D

GIS in the Workplace – How do you ensure it is right?

If you go to the doctor’s, you can guarantee you’re seeing a professional because they’re registered. You look to get an extension done on your house, and the architect is registered (in the UK)with the Royal Institute of British Architects, or the surveyor is registered with the Royal Institute of Chartered Surveyors. So how what...

6D SLAM

An indoor spatial intelligence start-up from Germany is pushing the BIM industry forward through a combo of navigation and visualization. The line of people at the Intergeo Trade Fair in Frankfurt, Germany, waiting to get their hands on the NavVis M6 was long. Where everyone was on the lookout for the latest geospatial products on...

Adventures in Droning: Part Two

As you may recall from the last issue of Pangaea, this series is about my experiences using a prosumer-level UAS to explore the possibilities of starting an aerial photography business. Here’s what I learned. Panic over LAANC? As I described in the first article, my first launch of the Spark never left the ground due...

Inexpensive Does Not Mean Cheap

A revolution is happening in affordable surveying and geospatial instruments and solutions: high-precision positioning has become much more accessible and affordable for existing and emerging end-user constituencies. Many folks may have found high-precision prohibitively expensive in the past or were resigned to low-precision choices, but now there are a lot more solution developers, manufacturers, and...

Weekly xyHt News Links: 08/9/2019

MicroSurvey introduces a new generation of data collection software with the launch of FieldGenius for AndroidTM Using the new “GPS on Bench Marks” interactive map Early earthquake warnings: GNSS could enable 10-second alerts USGIF Awards Highest Amount of Annual Scholarship Funds to Date SimActive Used to Validate Accuracy of DJI Phantom 4 RTK PECORA 21-...

UAV Stakes Out New Ground

Above: A prototype of the Civdrone UAV preparing to drill a stake into the ground. A flying/staking robot has taken a huge step forward in automation for site layout, including road, rail, utilities, and energy applications. Working the traditional way, how many surveyor-days would it take to mark the 300,000 points needed to lay out a...

Advertisement